Triad Engineering & Surveying staff designed the site improvements for the development of this 27.6-acre site. The design and permitting presented numerous challenges due to wetlands, a major power crossing, and restricted site access. The final design included master planning outparcels for future development and the design of a 10’ high retaining wall. The wall was utilized to allow for the construction of the parking area without encroaching into on-site freshwater wetlands.